Customization: | Available |
---|---|
Application: | Construction, Mining |
Certification: | ISO9001 |
Still deciding? Get samples of US$ 150/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Introduction:
The TPB-40 Pneumatic Crushing Pick exemplifies unparalleled efficiency, harnessing the incredible force of compressed air. By strategically directing air to both ends of the cylinder block, it sets a potent hammer movement in motion, delivering powerful impacts to the drill's end. This dynamic process effortlessly penetrates the concrete layer, breaking it into easily removable blocks.
Function:
KAITUO paving breakers are indispensable in road construction and foundation work, meticulously designed to demolish high-strength concrete with ease and precision.
High Durability & Long Life:
Crafted from premium-grade alloy steel forged parts, this tool boasts exceptional durability, ensuring consistent, long-lasting performance, even in the toughest conditions.
With an innovative front head design, this breaker promises longevity, offering superior durability for extended use.
A removable bushing is thoughtfully included to protect the front head from wear, significantly prolonging the tool's operational life.
Ergonomic Series Available:
Prioritizing worker comfort, an anti-vibration handle is available to enhance wellbeing and significantly reduce fatigue.
Functions:
Equipped with a forged latch retainer, this tool enables swift and effortless chisel changes, minimizing downtime and maximizing productivity.
The 4-bolts handle design ensures low operational costs, blending efficiency with cost-effectiveness.
Parameter/name | TPB-40 |
Piston diameter | 44mm |
Piston stroke | 146mm |
Percussive frequency | 1050 B.P.M |
N.W | 18kg |
Length | 660MM |
Air consumption | 1.6 m³/min |
Tracheal diameter | 19 |
bit head size | R25*108 |
Price Advantage
As a fully integrated industrial and trade enterprise, we proudly offer unbeatable factory-direct pricing!
How long will it take to deliver?
As the manufacturer, we initiate production immediately upon order confirmation. For stocked items, expect delivery within 15 days; larger orders may take up to 30 days for delivery.
What terms of payment do you accept?
We generally accept T/T or D/P. For T/T, a 30% deposit is required upfront, with the remaining 70% payable before shipment.
How long are your prices valid?
As a distinguished factory, our prices remain stable throughout the year. Adjustments are made only under these circumstances: (1) Fluctuations in the U.S. dollar exchange rate; (2) Increased labor or raw material costs necessitating manufacturer price changes.
What logistics can you use for transportation?
We offer three principal modes of freight transport (1) 80% of our shipments travel by sea to major continents such as Africa, South America, and the Middle East. (2) For landlocked neighboring countries, we provide road or rail deliveries.(3) For urgent shipments of light spare parts, air transportation is available to ensure quick delivery.