Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Features
Application areas:
Railway, tunnel, highway, metallurgy, coal mine, water conservancy and hydropower construction projects.
Model | Yt27 | YT28 |
N.W | 28kg | 26KG |
Length | 668mm | 661mm |
Air pressure | 0.4-0.63Mpa | 0.4-0.63Mpa |
Impact frequency | <=39hz | >=37HZ |
Air consumption | <=86L/s | <=81L/s |
Impact Energy | >=75J | >=70J |
Cylinder*stroke | 80mm*60mm | 80mm*60mm |
Air pipe diameter | 19mm | 25mm |
Shank dimension | 22*108mm | 22*108mm |
Drilling depth | 5M | 5M |
Bit diameter | 34-45mm | 34-42mm |
rock drills before use:What is a pneumatic rock drill?
2,Knock on the roof near the working face, i.e. check whether there are live rocks and loose rocks on the roof and second gang near the working face, and make necessary treatment.
3, the working surface of the flat shell hole location, is to be pounded flat in advance before allowing rock drilling, to prevent slippage or shell hole displacement.
4. It is strictly forbidden to drill dry eyes, and we should insist on wet rock drilling, turn on the water first and then the wind when operating, and turn off the wind and then the water when stopping drilling. When opening the hole, run at low speed first, and then drill at full speed after drilling to a certain depth.
5,No gloves are allowed to be worn by the drillers when drilling.
6,When using the air leg to drill the hole, pay attention to the standing posture and position, never rely on the body to pressurize, let alone stand in front of the rock drill under the work brazing rod, to prevent injury from broken brazing.
7,If abnormal sound and abnormal water discharge are found in rock drilling, stop the machine for inspection and find out the reason and eliminate it before continuing to drill.
8,When withdrawing from the rock drill or replacing the brazing rod, the rock drill can run slowly and pay attention to the position of the rock drill braze.
Price advantage
As an integrated industrial and trade enterprise, we offer factory-direct pricing!
How long will it take to deliver?
Being the manufacturer, we arrange production immediately upon order confirmation. For items in stock, expect delivery within 15 days; for larger orders, delivery may extend up to 30 days.
What terms of payment do you accept?
We typically accept T/T or D/P. For T/T, a 30% deposit is required upfront, with the remaining 70% due before shipment.
How long are your prices valid?
As a reputable factory, our prices are generally stable throughout the year. Adjustments occur only under two conditions: (1) Fluctuations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs prompting manufacturer price adjustments.
What logistics can you use for transportation?
There are three main modes of freight transport (1) 80% of shipments are by sea to major continents such as Africa, South America, and the Middle East. (2) Landlocked neighboring countries receive deliveries via road or rail.(3) For urgent light spare parts, air transportation is available.