Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Unleash top-tier performance with our Yt29A Pneumatic Rock Drilling Tool, designed to deliver unmatched efficiency and productivity in every task.
2. Swift Rock Drilling Speed: Achieve groundbreaking speed with our tool, ensuring faster penetration rates to maximize your productivity and keep projects on track.
3. Superior Lubrication System: Our advanced lubrication ensures smooth and prolonged operation of moving parts, drastically reducing wear and tear for extended equipment life.
4. Optimized Machine Design: Experience the perfect synergy of impact energy and frequency, making this tool indispensable for efficient and precise rock drilling operations.
5. Advanced Gas and Water Linkage: Benefit from rapid gas-leg return, adjustable air pressure, and more, all crafted to boost operational efficiency while maintaining peak performance.
6. User-Centric Control: Discover unparalleled convenience with our centralized control handle design, complete with a back head placement for ease of use. The innovative muffler cover not only reduces noise but also allows for adjustable discharge direction, enhancing field working conditions significantly.
Application Areas:
Effortlessly tackle mining projects, traffic tunnel construction, water conservancy works, quarry operations, and so much more with our versatile tool.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Pre-Operational Checklist: YT29A Rock Drill
1. Prior to deployment, meticulously ensure all components, including the rock drill, bracket, and any rock drill carts, are perfectly maintained with thorough lubrication. Confirm that wind and water pathways are unobstructed, guaranteeing all connection joints are secure and robust.
2. Conduct a thorough inspection of the overhead area near the operational face for any precarious or dislodged rocks, and address any potential hazards to ensure safety before commencing operations.
3. Verify that the working surface is perfectly level to prevent any slippage or displacement during the drilling process, ensuring optimal performance.
4. To maintain equipment integrity and operational safety, always employ a water-assisted drilling approach to avoid the hazards of dry drilling. Initiate the process with water flow, followed by air, and reverse the order when ceasing operations. Begin at a reduced speed, progressing to full speed as the desired depth is reached.
5. For safety, operators must refrain from wearing gloves while handling the equipment, ensuring a secure and unhindered grip on the machinery.
6. Maintain vigilance regarding your stance and positioning when using the air leg. Avoid applying body pressure and never stand directly in front of the rock drill to prevent potential injuries from broken brazing rods.
7. Should any unusual noises or water discharges manifest, immediately cease operation, thoroughly inspect the equipment, and resolve any issues prior to resuming work.
8. Exercise caution and control when retracting the rock drill or replacing the brazing rod. Operate at reduced speeds and remain acutely aware of the brazing rod's position to ensure safety and prevent mishaps.
Unbeatable Price Advantage
As a distinguished integrated industrial and trade enterprise, we proudly present factory-direct pricing that ensures unparalleled value for our esteemed clients!
Delivery Timeline: How Long Will You Wait?
As the manufacturer, we initiate production immediately upon order confirmation. For items readily available in our inventory, anticipate delivery within an impressive 15 days; more substantial orders may require up to 30 days for delivery.
What Are Your Accepted Terms of Payment?
Our standard payment terms include T/T or D/P. For T/T transactions, a 30% deposit is necessary at the outset, with the remaining 70% to be settled before shipment.
Stability of Our Pricing: How Long Are They Valid For?
As a factory of repute, our pricing remains consistently stable throughout the year, with adjustments only in two scenarios: (1) Variations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs that necessitate manufacturer price adjustments.
Transportation Logistics: What Options Are Available?
We offer three principal modes of freight transportation for your convenience. (1) Approximately 80% of our shipments travel by sea, reaching major continents including Africa, South America, and the Middle East. (2) Deliveries to landlocked neighboring countries are efficiently managed via road or rail.(3) For urgent and lightweight spare parts, we provide air transportation to ensure prompt delivery.