Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Revolutionizing performance standards, the Yt29A Efficient Pneumatic Hammer Drill boasts exceptional power output, ensuring top-tier efficiency and unmatched productivity.
2. Swift Rock Drilling Speed: Achieve breakthrough results with our state-of-the-art drilling technology that maximizes penetration speed, guaranteeing exceptional productivity and efficiency.
3. Superior Lubrication System: Engineered for excellence, the advanced lubrication system extends the longevity of moving components, significantly reducing wear and tear for sustained high performance.
4. Optimized Machine Design: Master the art of rock drilling with our expertly engineered design, which harmonizes impact energy and frequency, making it the quintessential tool for your drilling endeavors.
5. Advanced Gas and Water Linkage: Elevate your operational efficiency with our sophisticated gas and water linkage system, featuring rapid gas-leg return and versatile air pressure adjustments for a seamless experience.
6. User-Centric Control: Designed with the user in mind, the control handle is strategically centralized with the back head for innovative and ergonomic operation. The effective muffler cover not only minimizes noise but also offers adjustable discharge direction, enhancing the working environment.
Application Areas:
Perfectly suited for a wide array of demanding projects, our drill is the ideal choice for mining, traffic tunnels, water conservancy construction, quarries, and much more.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Preparing to Use the YT29A Rock Drill: Essential Steps for Safety and Efficiency
1. Conduct a thorough inspection to ensure all components, such as the rock drill, bracket, and rock drill cart, are in pristine condition and properly lubricated. Verify that wind and water pathways are unobstructed and all connection joints are securely fastened.
2. Carefully examine the roof near the operational area for any loose or potentially hazardous rocks, and rectify any issues to ensure a safe working environment.
3. Confirm the working surface is level and stable before commencing drilling operations to prevent any slippage or displacement which could compromise safety.
4. Consistently use water while drilling to prevent dry drilling. Initiate operations with water, followed by wind, and remember to reverse this procedure when halting. Begin drilling at a low speed, transitioning to full speed upon reaching a satisfactory depth.
5. It is crucial for drill operators to refrain from wearing gloves during operation to maintain optimal control and safety.
6. Pay close attention to your standing posture and positioning while utilizing the air leg; avoid applying body pressure and never stand in front of the rock drill to minimize the risk of injury from fractured brazing rods.
7. In the event of hearing irregular sounds or observing unexpected water discharge, promptly cease operation, conduct a thorough inspection, and resolve any issues before resuming use.
8. Exercise caution when retracting the rock drill or replacing the brazing rod—operate slowly and remain vigilant about the position of the brazing rod to ensure safety and precision.
Price Advantage
As a leading integrated industrial and trade enterprise, we are delighted to offer the unmatched benefit of factory-direct pricing! Our commitment to value ensures you receive competitive prices without intermediary markups.
Delivery Timeframe
As the dedicated manufacturer, we prioritize efficiency and promptness. Production kicks off immediately upon order confirmation. For products available in stock, anticipate delivery within a swift 15 days. For larger orders, the delivery timeline may extend up to 30 days, ensuring meticulous attention to every detail.
Accepted Payment Terms
To facilitate seamless transactions, we typically embrace T/T or D/P payment terms. For T/T, a 30% deposit is required initially, securing your order, with the remaining 70% balance payable before shipment to guarantee fulfillment.
Price Validity Duration
Our prices exhibit remarkable stability throughout the year, reflecting our status as a reputable factory. Price adjustments are rare and occur only due to: (1) Significant fluctuations in the U.S. dollar exchange rate; or (2) Substantial increases in labor or raw material costs necessitating manufacturer price updates.
Transportation Logistics Options
We utilize three primary modes of freight transport to ensure efficient delivery to our global clientele: (1) An impressive 80% of our shipments are dispatched by sea, reaching major continents such as Africa, South America, and the Middle East, optimizing cost-effectiveness and reliability. (2) Landlocked neighboring countries benefit from direct road or rail deliveries, ensuring accessibility and convenience.(3) For urgent and lightweight spare parts, air transportation is promptly available, balancing speed and efficiency for time-sensitive needs.