Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Experience exceptional performance as our product delivers top-tier power with heightened efficiency, giving you more productivity in every task.
2. Swift Rock Drilling Speed: Unlock unparalleled speed with faster penetration rates that drive maximum productivity, ensuring you complete projects swiftly and efficiently.
3. Superior Lubrication System: Benefit from an advanced lubrication system that guarantees prolonged operation of moving parts, minimizing wear and tear for lasting durability.
4. Optimized Machine Design: Enjoy the ideal balance of impact energy and frequency in a perfectly optimized design, making this tool indispensable for rock drilling applications.
5. Advanced Gas and Water Linkage: Equipped with quick gas-leg return and air pressure adjustments, this feature significantly boosts operational efficiency and reliability.
6. User-Centric Control: Featuring a control handle centralized with the back head, this novel design offers unmatched convenience. The muffler cover reduces noise, with an adjustable discharge direction enhancing working conditions on-site.
Application Areas:
Ideal for a broad range of applications including mining, traffic tunnels, water conservancy construction, quarries, and beyond, showcasing extraordinary versatility.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Before Using the YT29A Rock Drill: Essential Preparations for Optimal Performance
1. Thoroughly inspect all components, including the rock drill, bracket, or rock drill cart, ensuring they are in pristine condition and well-lubricated. Confirm unobstructed wind and water pathways, and make sure all connection joints are securely fastened.
2. Conduct a meticulous inspection of the roof near the working face for any live or loose rocks. Address and rectify any potential hazards before commencing operations.
3. Guarantee that the working surface is perfectly flat prior to drilling. This precaution helps prevent any slippage or displacement during operation.
4. Consistently drill with water to prevent dry drilling. Initiate with a water flow, followed by wind operation. Upon stopping, reverse the sequence. Start at a low speed, progressing to full speed once a suitable depth is achieved.
5. It is imperative that drillers refrain from wearing gloves while operating the machinery to ensure safety and control.
6. Maintain an attentive posture and correct position when using the air leg. Avoid applying pressure with your body and never position yourself in front of the rock drill to minimize the risk of injury from broken brazing rods.
7. If any abnormal sounds or unexpected water discharge is detected, immediately halt the machine. Conduct a thorough inspection and resolve any issues before resuming operation.
8. When retracting the rock drill or changing the brazing rod, proceed with caution by operating the drill slowly and paying close attention to the brazing rod's position.
Unbeatable Price Advantage
Benefit from our integrated industrial and trade enterprise model, offering you the unbeatable advantage of factory-direct pricing!
Delivery Timeline: How Soon Will You Receive Your Order?
As the esteemed manufacturer, we prioritize your order the moment it's confirmed. For items readily available in our inventory, anticipate a swift delivery within just 15 days. For larger, customized orders, the delivery timeline may extend up to a maximum of 30 days, ensuring top-notch quality and precision.
What Payment Terms are Available?
We offer flexible payment options, typically accepting T/T or D/P. For T/T transactions, a 30% deposit is required upfront to initiate production, with the remaining 70% due just before shipment.
Validity of Our Competitive Prices
Our reputation as a respected factory hinges on the stability of our prices throughout the year. Price adjustments are rare and occur only under specific circumstances: (1) Significant fluctuations in the U.S. dollar exchange rate; (2) Substantial increases in labor or raw material costs which necessitate manufacturer price changes.
What Logistics Options Are Available for Transportation?
Explore Our Three Main Freight Transport Modes (1) A substantial 80% of our shipments are dispatched by sea, reaching major continents including Africa, South America, and the Middle East. (2) For our landlocked neighboring countries, we facilitate deliveries via efficient road or rail networks.(3) For urgent and lightweight spare parts, we offer the convenience of air transportation, ensuring your parts arrive in record time.