Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Elevate your projects with our handheld rock drill, delivering unparalleled performance and heightened efficiency.
2. Swift Rock Drilling Speed: Achieve rapid penetration, significantly boosting productivity and cutting down on time.
3. Superior Lubrication System: This ensures extended operational longevity of all moving parts by minimizing wear and tear, guaranteeing dependable durability.
4. Optimized Machine Design: Striking the perfect balance of impact energy and frequency, this drill stands as the quintessential tool for rock drilling tasks.
5. Advanced Gas and Water Linkage: Incorporating features like quick gas-leg return and adaptable air pressure settings, it promotes enhanced operational efficiency for various applications.
6. User-Centric Control: Thoughtfully designed with a centralized control handle alongside the back head, offering a novel yet seamless operation. The integrated muffler cover effectively reduces noise while the adjustable discharge direction significantly improves field working conditions.
Application Areas:
Perfectly suited for mining, traffic tunnels, water conservancy projects, quarries, and beyond, ensuring versatility in diverse settings.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Before Using the YT29A Rock Drill:
1. Prior to engaging with the YT29A Rock Drill, it is crucial to ensure that all components, including the rock drill, bracket, or rock drill cart, are completely intact and thoroughly lubricated. Confirm the smooth operation of wind and water pathways and secure all connection joints firmly in place for optimal performance.
2. Conduct a thorough inspection of the roof near the working face to identify and rectify any loose or live rocks before commencing operations, ensuring a safe and secure working environment.
3. Guarantee the working surface is perfectly flat and stable before initiating drilling activities to prevent any risk of slippage or displacement, ensuring precision and safety.
4. To prevent dry drilling, always use water. Initiate drilling with water flow, followed by wind. When halting operations, reverse the sequence—wind first, then water. Begin drilling at a low speed, transitioning to full speed as a certain depth is achieved for optimal efficiency.
5. For safety, operators must refrain from wearing gloves while handling the drill, ensuring better control and reducing the risk of accidents.
6. Maintain an attentive focus on your standing posture and position when utilizing the air leg. Avoid applying body pressure and never stand directly in front of the rock drill to prevent potential injuries from broken brazing rods.
7. Should you encounter any abnormal sounds or water discharges, immediately cease machine operations, conduct an inspection, and rectify any issues before continuing, ensuring a smooth and safe operation process.
8. When retracting the rock drill or changing the brazing rod, operate the drill at a slow pace and maintain awareness of the brazing rod's position for safe and effective handling.
Price Advantage: Exceptional Value for Quality Products
As a dynamic industrial and trade enterprise, we provide unbeatable factory-direct pricing, ensuring you receive outstanding value without intermediaries!
How long will it take to deliver? Your Timeline, Our Commitment.
As the esteemed manufacturer, we streamline production immediately upon order confirmation. For items in our inventory, anticipate delivery within an impressive timeframe of 15 days; for substantial orders, expect reliable delivery within a maximum of 30 days.
What terms of payment do you accept? Flexible Payment Solutions Tailored for You.
Our typical payment terms include T/T or D/P. For T/T transactions, a convenient 30% deposit is required upfront, with the remaining 70% payable prior to shipping.
How long are your prices valid? Consistent Pricing Throughout the Year.
As a trusted factory, our prices remain consistently stable throughout the year. Adjustments are made only under two specific conditions: (1) Significant shifts in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs that necessitate manufacturer price recalibration.
What logistics can you use for transportation? Comprehensive and Versatile Logistics Solutions for Every Need.
There are three primary modes of freight transport, assuring efficient delivery: (1) A substantial 80% of shipments travel by sea to prominent continents such as Africa, South America, and the Middle East. (2) Landlocked neighboring countries benefit from road or rail transport, ensuring seamless delivery.(3) For urgent, lightweight spare parts, air transportation is available, ensuring swift arrival to meet your needs.