Features
1. The YT27 air leg rock drill boasts an impressive capability for powerful blowing, ensuring efficient cleaning of the gun hole, coupled with a high torque mechanism for optimum brazing operations.
2. Beyond the remarkable benefits of the YT27 air-legged rock drill, this model innovatively incorporates a flange control valve to facilitate gas production along with additional functionalities.
3. The YT27 air-legged rock drills are expertly designed for peak performance in large mining operations and extensive roadway projects, making them the ideal choice for rigorous rock drilling tasks.
4. Equipped with advanced mechanisms such as air-water linkage, swift air-leg retraction, and precise air pressure adjustment, this model delivers unmatched efficiency.
5. With control handles conveniently arranged around the main handle, the mechanism is not only innovative but also user-friendly, ensuring effortless operation.
6. The intelligent sound-deadening cover significantly diminishes noise levels and allows for flexible exhaust direction adjustments, thereby enhancing on-site working conditions.
Application areas:
The YT27 Mine Drilling Rig excels in versatile environments, making it indispensable for railway, tunnel, highway, metallurgy, coal mining, water conservancy, and hydropower construction projects.
Model | Yt27 |
N.W | 28kg |
Length | 688mm |
Bit Head Size | R22×108mm |
Air Consumption | ≤80 L/S |
Percussive Frequency | ≥36.7 Hz |
Impact Energy | ≥75.5 J |
Boreholes Diameter | 34-45mm |
Piston Diameter | 80mm |
Piston Stroke | 60mm |
Working Air Pressure | 0.63 Mpa |
Working Water Pressure | 0.3 Mpa |
Drilled Holes Depth | 2m-5m |
Preparation Tips for Using YT27 Rock Drills: Ensure Optimal Performance and SafetyUnveiling the Pneumatic Rock Drill: What Exactly Is It?
2. Conduct a thorough evaluation of the roof near the working face. Examine for any loose or potentially unstable rocks and apply the necessary treatments to stabilize them, ensuring a safe working environment.
3. The site of the flat shell hole must be meticulously prepared and leveled before rock drilling commences. This precautionary measure prevents unwanted slippage or displacement of the shell hole during operations.
4. Adhere strictly to wet rock drilling practices. Initiate operations by turning on the water supply before activating the wind. When halting drilling, reverse this sequence. Begin drilling at a low speed, gradually increasing to full speed once a certain depth is achieved. This method ensures optimal performance and safety.
5. For safety reasons, drillers must refrain from wearing gloves during the drilling process, minimizing potential hazards.
6. When utilizing the air leg for drilling, maintain a vigilant posture and position. Avoid using body weight to apply pressure. Never stand directly in front of the rock drill or under the brazing rod during operation to prevent injury from any possible breakage.
7. Should any unusual noises or irregular water discharges occur, cease operations immediately. Inspect the machinery thoroughly to identify and resolve the issue before resuming drilling.
8. When retracting the rock drill or exchanging the brazing rod, operate the rock drill at a reduced speed. Pay close attention to the position of the rock drill braze to ensure precise and safe handling.