Customization: | Available |
---|---|
Application: | Construction, Mining |
Certification: | ISO9001 |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Introduction:
The TPB-40 Pneumatic Crushing Pick stands as an epitome of efficiency, leveraging the formidable force of compressed air. It ingeniously directs air to both ends of the cylinder block, initiating a powerful back-and-forth hammer movement that delivers potent impacts to the drill's edge. This dynamic mechanism penetrates the concrete layer with impressive efficacy, fragmenting it into easily removable blocks.
Function:
KAITUO paving breakers are indispensable tools for road construction and building foundation sites, meticulously crafted to shatter high-strength concrete with ease and precision.
High Durability & Long Life:
Crafted from premium alloy steel forged parts, this tool exhibits unsurpassed durability, ensuring outstanding performance even in the harshest conditions.
Boasting an innovative front head design, this breaker is engineered to endure, promising exceptional durability and prolonged operational life.
A removable bushing is incorporated to shield the front head from wear and tear, further extending the tool's operational lifespan.
Ergonomic Series Available:
Engineered with worker comfort as a priority, an anti-vibration handle is available to enhance healthcare and minimize fatigue.
Functions:
Equipped with a forged latch retainer, this tool ensures rapid and effortless chisel changes, dramatically minimizing downtime.
The 4-bolts handle design guarantees minimal running costs, seamlessly merging efficiency with economical operation.
Parameter/name | TPB-40 |
Piston diameter | 44mm |
Piston stroke | 146mm |
Percussive frequency | 1050 B.P.M |
N.W | 18kg |
Length | 660MM |
Air consumption | 1.6 m³/min |
Tracheal diameter | 19 |
bit head size | R25*108 |
Price Advantage
As an integrated industrial and trade enterprise, we proudly offer factory-direct pricing, ensuring unbeatable value!
How long will it take to deliver?
As the direct manufacturer, we initiate production promptly upon order confirmation. For items in stock, expect delivery within 15 days; for larger orders, delivery may extend up to 30 days.
What terms of payment do you accept?
Our standard payment terms include T/T or D/P. With T/T, a 30% deposit is required upfront, and the remaining 70% is payable before shipment.
How long are your prices valid?
As a reputable factory, our prices are generally stable throughout the year. Adjustments occur only under specific conditions: (1) Fluctuations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs leading to manufacturer price adjustments.
What logistics can you use for transportation?
We employ three main modes of freight transport (1) A significant 80% of shipments are conducted by sea, reaching major continents such as Africa, South America, and the Middle East. (2) Landlocked neighboring countries receive deliveries via road or rail.(3) For urgent light spare parts, air transportation is available, ensuring prompt delivery.