Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Unmatched Output Power: Experience the pinnacle of performance with our Yt29A Rock Drill Pneumatic Tool, boasting enhanced output power for superior efficiency in every task.
2. Accelerated Rock Drilling Speed: Unlock unprecedented productivity with our tool's rapid penetration rates, ensuring every project is completed with utmost speed and precision.
3. Exceptional Lubrication System: Designed to perfection, our superior lubrication system guarantees extended operation of moving parts, significantly minimizing wear and tear for long-lasting durability.
4. Precision-Optimized Machine Design: Crafted with a meticulous balance of impact energy and frequency, this tool stands as the quintessential choice for all rock drilling needs.
5. Innovative Gas and Water Linkage: This cutting-edge feature includes swift gas-leg return and adjustable air pressure, elevating operational efficiency to new heights.
6. Ergonomic User-Centric Control: With a centralized control handle positioned alongside the back head, enjoy a novel, intuitive operation. The efficient muffler cover not only diminishes noise but also offers variable discharge direction, enhancing the overall field working environment.
Application Areas:
Perfectly suited for diverse applications such as mining, traffic tunnels, water conservancy construction, quarries, and beyond, ensuring adaptability and reliability in every venture.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Pre-Operation Checklist for the YT29A Rock Drill:
1. Prior to initiating operation, verify that every component, including the rock drill, bracket, or rock drill cart, is in impeccable condition and thoroughly lubricated for optimal performance. Ensure that both wind and water pathways are unobstructed and that all connection joints are securely fastened.
2. Conduct a thorough inspection of the roof near the work area to identify any live or loose rocks. Address these potential hazards to ensure a safe commencement of operations.
3. Confirm that the working surface is perfectly flat before initiating drilling activities to prevent any slippage or accidental displacement, ensuring precise drilling results.
4. Always incorporate water when drilling to eliminate the risks associated with dry drilling. Initiate operations with water flow, followed by wind. When halting operations, reverse this sequence. Begin drilling at a reduced speed, transitioning to full speed once the desired drilling depth is achieved.
5. Operators are advised against wearing gloves during drilling operations to maintain dexterity and safety.
6. Maintain optimal posture and positioning when utilizing the air leg. Refrain from exerting pressure with your body and avoid positioning yourself directly in front of the rock drill to mitigate the risk of injury from unexpected breakage of brazing rods.
7. Should you detect any abnormal sounds or unexpected water discharge, immediately cease operation of the machine, undertake a comprehensive inspection, and address any identified issues prior to resuming work.
8. Exercise caution when retracting the rock drill or replacing the brazing rod. Operate the drill at a moderated pace, with acute awareness of the brazing rod's position to ensure safe maneuvers.
Unbeatable Price Advantage
As a leading integrated industrial and trade enterprise, we proudly present our customers with exclusive factory-direct pricing.
How long will it take to deliver?
As the original manufacturer, we prioritize your orders by initiating production right upon confirmation. For items readily available in stock, anticipate delivery within a swift 15-day period. Larger or custom orders may require up to 30 days for delivery, ensuring meticulous attention to quality.
What terms of payment do you accept?
We typically accommodate T/T or D/P payment methods. For T/T transactions, a 30% deposit is necessary upfront, with the remaining 70% payable before the shipment of your order.
How long are your prices valid?
As a factory recognized for its reliability, our prices maintain consistency throughout the year. Adjustments are triggered by: (1) Fluctuations in the U.S. dollar exchange rate; (2) Escalations in labor or raw material costs prompting necessary price modifications.
What logistics can you use for transportation?
Explore Our Three Prime Freight Transport Modes (1) A dominant 80% of our shipments take the sea route, reaching principal continents like Africa, South America, and the Middle East, ensuring global coverage.(3) For urgent and lightweight spare parts, our efficient air transportation service is readily available to meet tight deadlines.