Air Leg Rock Drill for Efficient Mining and Drilling Tasks

Product Details
Certification: CE, ISO 9001:2000
Condition: New
Drilling Way: Rotary
Still deciding? Get samples of US$ 225/Piece
Request Sample
Gold Member Since 2024

Suppliers with verified business licenses

Year of Establishment
2024-04-24
Plant Area
1733 square meters
  • Air Leg Rock Drill for Efficient Mining and Drilling Tasks
  • Air Leg Rock Drill for Efficient Mining and Drilling Tasks
  • Air Leg Rock Drill for Efficient Mining and Drilling Tasks
  • Air Leg Rock Drill for Efficient Mining and Drilling Tasks
  • Air Leg Rock Drill for Efficient Mining and Drilling Tasks
  • Air Leg Rock Drill for Efficient Mining and Drilling Tasks
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Frequently asked questions
Overview

Basic Info.

Model NO.
YT28
Model No.
Yt28
Air Consumption
81L/S
Piston Diameter
80mm
Bit Head Size
R22*108mm
Model
Yt28
Drilled Holes Depth
1.2-5m
Transport Package
Carton/Wooden Box
Specification
70*28*20CM
Trademark
Kai tuo
Origin
Hebei
HS Code
8430390000
Production Capacity
1000pieces/Month

Product Description

Air Leg Rock Drill for Efficient Mining and Drilling Tasks

Behold the YT28 Air-Leg Rock Drill, a masterpiece of innovative engineering that redefines high-efficiency, energy-saving, and eco-friendly rock drilling technology. The YT28 dominates in the realm of pneumatic products with its exceptional reliability, characterized by an impressively low failure rate. Experience swift rock drilling speeds alongside the unparalleled durability of its wear-resistant components. Moreover, revel in its tranquil operation with low noise levels, appreciate its lightweight and ergonomic design, and enjoy its intuitive, user-friendly functionality.

Air Leg Rock Drill for Efficient Mining and Drilling Tasks

Product Description

1. The YT28 is engineered with an optimal height and an extensive stroke capacity, allowing it to expertly drill anchor holes that are perfectly perpendicular to the roof surface. This exceptional feature effectively resolves the age-old challenge of non-perpendicular anchoring in roadways, significantly elevating project quality and pace while simultaneously slashing construction expenses and maximizing operational efficiency.
2. Boasting exceptional rock drilling capabilities, the YT28 excels in penetrating medium-hard rocks and rocks with a hardness coefficient up to f≤6. Its remarkable adaptability renders it perfect for drilling in both rock roadways and quasi roadways, showcasing its impressive versatility.
3. Designed with a streamlined structure, the YT28 exemplifies durability and ease of maintenance, leading to notably reduced maintenance costs and ensuring sustained performance over time.
4. Equipped with a nimble start mechanism, air-water linkage, rapid air-leg return, and air pressure adjustment systems, the YT28 guarantees unmatched operational efficiency and smooth functionality.
5. The innovative design of the control handle is seamlessly integrated with the shank body, providing a novel and user-friendly operation experience. The muffler cover effectively minimizes noise and facilitates adjustable exhaust direction, greatly enhancing field operation conditions and user comfort.
6. The YT28 Rock Drill is perfectly suited for wet drilling in challenging medium to hard rock environments, showcasing its robust performance capabilities.

Application Areas:

Specially engineered for mining, transportation, tunnels, water conservancy projects, quarries, and a diverse array of other construction operations, the YT28 is your go-to solution for reliable performance in demanding conditions.

Product Parameters

Air Leg Rock Drill for Efficient Mining and Drilling Tasks
Product Model: YT28
Net weight: 26KG
Total length: 66.1CM
Air consumption: ≤81L/S
Impact frequency: ≥37Hz
Drilling diameter: 34-42mm
Piston diameter: 80mm
Piston stroke: 60mm
Working air pressure: 0.63mpa
Working water pressure: 0.3mpa
Drilling depth:  5M

Preparing Your YT28 Pneumatic Air Leg Rock Drill for Optimal Performance

1. Prior to embarking on any drilling task, meticulously inspect the entirety of your equipment. Ensure the integrity and seamless rotation of all components, including the rock drill, its supportive bracket, or the rock drill cart. Administer the necessary lubricant to maintain peak performance levels. Moreover, verify that wind and water pathways remain unobstructed, and all connections are secure and robust.

2. Conduct a diligent examination of the roof in proximity to the working face to identify any live or loose rocks. Implement essential treatments to guarantee a safe and secure working environment.

3. Prepare the working surface meticulously by pounding it flat in advance. This precaution prevents any slippage or undesired displacement of the shell hole, ensuring precision in your drilling operation.

4. Adhering to best practices is crucial: drilling dry holes is strictly prohibited. Always opt for wet rock drilling to optimize safety and efficiency. Begin with the water supply, followed by activating the wind. Conversely, when ceasing operations, turn off the wind before stopping the water. Start the drilling process at a reduced speed, gradually accelerating to full speed as you achieve greater depth.

5. For optimal safety, ensure that drillers refrain from wearing gloves during drilling activities to mitigate any potential safety risks.

6. When engaging the air leg for drilling, maintain a prudent stance and position. Avoid applying body pressure and refrain from standing directly in front of the rock drill. This precaution is vital to protect against potential injuries from broken brazing.

7. Should you detect any abnormal sounds or unexpected water discharges during rock drilling, halt the operation immediately for a thorough inspection. Diagnose and remedy the issue prior to resuming work.

8. When the time comes to withdraw the rock drill or replace the brazing rod, proceed with care. Operate the rock drill at a controlled pace, paying close attention to the position and alignment of the brazing rod to ensure smooth operation.

Detailed Photos

Air Leg Rock Drill for Efficient Mining and Drilling Tasks
Air Leg Rock Drill for Efficient Mining and Drilling Tasks

Air Leg Rock Drill for Efficient Mining and Drilling Tasks

Frequently asked questions

Unbeatable Price Advantage
Experience unmatched value with Xianghe Kaituo Mining Machinery Co., Ltd.! As a pioneering integrated industrial and trade enterprise, we proudly offer our clients factory-direct pricing, ensuring that you receive the best possible prices without any middleman markups.
Delivery Timeframes and Expectations
As the direct manufacturer, we prioritize and expedite production immediately after order confirmation. For items readily available in stock, your delivery is typically completed within an efficient 15-day timeline. For larger, more customized orders, the delivery period may be extended up to a maximum of 30 days, ensuring quality and precision.
Accepted Payment Terms
Our flexible payment options primarily include T/T (Telegraphic Transfer) and D/P (Documents against Payment). For T/T transactions, we require a 30% deposit at the onset, with the remaining 70% balance due just before the shipment departs, offering you convenience and security.
Price Stability and Validity
At Xianghe Kaituo Mining Machinery Co., Ltd., we pride ourselves on our stable pricing strategy, which generally remains consistent throughout the year. Price revisions only occur under specific circumstances such as (1) significant fluctuations in the U.S. dollar exchange rate, or (2) increases in labor or raw material costs necessitating a price adjustment by the manufacturer.
Logistics and Transportation Options
Diverse Freight Transport Modes (1) The majority of our shipments, approximately 80%, are dispatched via sea freight, reaching major continents including Africa, South America, and the Middle East. (2) Deliveries to landlocked neighboring countries are efficiently handled through road or rail services, ensuring seamless connectivity.(3) For urgent and lightweight spare parts, we offer expedited air transportation options, ensuring rapid delivery to meet your critical needs.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier