Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Experience the ultimate in performance with our Yt29A Advanced Pneumatic Rock Drill, boasting exceptional efficiency that elevates your drilling tasks to a whole new level.
2. Swift Rock Drilling Speed: Unleash the power of rapid penetration rates, designed to skyrocket your productivity and revolutionize your drilling operations.
3. Superior Lubrication System: Enjoy extended longevity of your equipment with our cutting-edge lubrication system, meticulously engineered to minimize wear and tear on moving components.
4. Optimized Machine Design: Discover the perfect symbiosis of impact energy and frequency, crafting an unparalleled tool that is the epitome of efficiency for rock drilling endeavors.
5. Advanced Gas and Water Linkage: Innovative features such as swift gas-leg return and adaptable air pressure settings contribute to heightened operational efficiency, ensuring smooth and seamless functionality.
6. User-Centric Control: Enjoy the convenience of a central control handle coupled with a strategically positioned back head, offering an intuitive operation. The effective muffler cover not only diminishes noise but also provides adjustable discharge direction, enhancing the conditions at your work site.
Application Areas:
Perfectly suited for mining, traffic tunnels, water conservancy construction, quarries, and many other demanding applications, our rock drill is your go-to solution for diverse and challenging environments.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Important Preparations Before Using the YT29A Rock Drill:
1. Ensure every component—whether it's the rock drill, bracket, or cart—is in pristine condition and thoroughly lubricated. Confirm seamless airflow and water flow through all channels, and reinforce all connection joints to ensure they're secure.
2. Thoroughly inspect the overhead area near your working face for any loose or precarious rocks. Address these potential hazards proactively before initiating operations.
3. Guarantee that the working surface is confidently flat to prevent any risky slippage or unwanted displacement during the drilling process.
4. Always engage in wet drilling—never dry. Initiate operations with water, follow with wind, and reverse this order when ceasing activity. Begin at a gentle speed, transitioning to full throttle once you've achieved a satisfactory depth.
5. Under no circumstances should drillers wear gloves during operation.
6. Maintain an attentive posture and careful positioning while utilizing the air leg. Avoid applying body pressure and never stand in front of the rock drill to mitigate the risk of injury from brittle brazing rods.
7. Should you encounter unusual noises or unexpected water expulsion, halt operations immediately. Conduct a thorough inspection and remedy any issues prior to resuming.
8. When retracting the rock drill or substituting the brazing rod, proceed with deliberate caution. Operate the drill slowly and attentively monitor the positioning of the brazing rod.
Unmatched Price Advantage
As a distinguished industrial and trade enterprise, we proudly offer factory-direct pricing, ensuring you receive the best value for your investment!
What is the Delivery Timeline?
As the original manufacturer, we initiate production immediately upon order confirmation. For readily available stock items, anticipate delivery within 15 days. For larger or custom orders, the delivery timeline may extend up to 30 days.
Accepted Payment Terms
Our standard payment terms include T/T or D/P. For T/T transactions, a 30% deposit is required to secure your order, with the remaining 70% payable before shipment is dispatched.
Price Validity Period
As a trusted manufacturer, we maintain stable pricing throughout the year. Adjustments are only made under the following circumstances: (1) Significant changes in the U.S. dollar exchange rate; (2) Rising labor or raw material costs necessitating price updates.
Transportation Logistics Options
We offer three primary modes of transportation to suit your needs: (1) Sea freight, which constitutes 80% of our shipments, caters to major destinations across Africa, South America, and the Middle East. (2) For landlocked neighboring countries, we provide road or rail delivery solutions.(3) For urgent and lightweight spare parts, we offer expedited air transport services.