Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Elevate your drilling experience with the Yt29A Air Leg Rock Drill, offering unparalleled performance and maximizing efficiency.
2. Swift Rock Drilling Speed: Propel your productivity with rapid penetration rates that redefine efficiency and pace.
3. Superior Lubrication System: Engineered for longevity, this state-of-the-art lubrication system minimizes wear and tear, ensuring seamless operation of all moving parts.
4. Optimized Machine Design: Achieve the perfect synergy between impact energy and frequency, making this drill the ultimate choice for demanding rock drilling tasks.
5. Advanced Gas and Water Linkage: Experience cutting-edge advancements with swift gas-leg returns, intuitive air pressure adjustments, and unparalleled operational efficiency.
6. User-Centric Control: Discover innovative control with a centralized handle designed for ease-of-use, combined with a muffler cover that minimizes noise and offers adjustable discharge direction to enhance on-site working conditions.
Application Areas:
Versatile and robust, this rock drill is perfect for a range of challenging environments including mining, traffic tunnels, water conservancy projects, quarries, and beyond.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Before Using the YT29A Rock Drill: Essential Preparations
1. Make sure that every component, including the rock drill, its bracket, or the rock drill cart, is in perfect condition and thoroughly lubricated. Confirm that the wind and water pathways are clear and that all connection joints are firmly secured.
2. Conduct a thorough inspection of the overhead area near the working face for any loose or potentially hazardous rocks. Address these issues immediately to ensure a safe working environment before commencing any drilling.
3. Verify that the working surface is completely level before initiating drilling operations. This precaution helps prevent any unwanted slippage or displacement, ensuring precise and safe drilling.
4. It is crucial to always drill with water to prevent the hazards of dry drilling. Begin with a flow of water, followed by air when operating. Reverse this sequence when stopping, starting at a low speed and progressing to full speed once a sufficient depth is reached.
5. Operators should never wear gloves during the operation of the drill to maintain optimal control and safety.
6. Maintain conscious awareness of your posture and position while using the air leg. Avoid pressurizing with your body and refrain from standing directly in front of the rock drill to prevent injuries from any potential breakage of brazing rods.
7. If you detect any unusual noises or if water discharge occurs unexpectedly, halt the operation immediately. Conduct a thorough inspection and rectify any issues before resuming use.
8. During the withdrawal of the rock drill or replacement of the brazing rod, operate the drill with care and at a slow speed. Always be mindful of the position of the brazing rod to ensure safety and accuracy.
Our Unmatched Price Advantage
As a seamlessly integrated industrial and trade enterprise, we proudly present factory-direct pricing, ensuring you receive the best value without any intermediaries!
What is the Expected Delivery Timeframe for Your Orders?
As the direct manufacturer, we jumpstart production as soon as your order is confirmed. For items already in stock, you can anticipate a swift delivery within just 15 days. For larger orders, the delivery period might extend up to 30 days, ensuring quality and precision.
What Are Your Accepted Payment Terms?
Our preferred methods of payment include T/T and D/P. For T/T transactions, we require a 30% deposit to initiate the process, with the remaining 70% settled prior to shipment, guaranteeing a secure transaction.
What Is the Duration of Your Price Validity?
As a trusted and reputable factory, our prices remain consistently stable throughout the year. Adjustments are rare and occur only under two specific conditions: (1) Significant fluctuations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs that necessitate manufacturer price adjustments.
What Logistics Options Are Available for Transportation?
Three Main Modes of Freight Transport Available for Your Convenience (1) A significant 80% of our shipments are dispatched by sea, reaching major continents such as Africa, South America, and the Middle East. (2) For our landlocked neighboring countries, we ensure efficient delivery via road or rail.(3) For urgent and lightweight spare parts, we offer swift air transportation, ensuring timely delivery.