Surface Treatment: | Oxidation |
---|---|
Manufacturing Process: | Casting |
Material: | Carbon Steel |
Still deciding? Get samples of US$ 19/Piece
Request Sample
|
Suppliers with verified business licenses
Price advantage
As a vertically integrated industrial and trade enterprise, we provide factory-direct pricing, ensuring unmatched value and cost efficiency!
How long will it take to deliver?
As the manufacturer, we initiate production immediately upon order confirmation. For in-stock items, expect delivery within 15 days. For larger orders, delivery may extend up to 30 days, ensuring timely fulfillment.
What terms of payment do you accept?
We typically accept T/T or D/P terms. For T/T, a 30% deposit is required upfront, with the remaining 70% payable before shipment, ensuring smooth financial transactions.
How long are your prices valid?
As a well-respected factory, our prices remain stable throughout the year. Adjustments occur only under specific conditions: fluctuations in the U.S. dollar exchange rate or hikes in labor and raw material costs leading to manufacturer price adjustments.
What logistics can you use for transportation?
There are three main modes of freight transport: (1) Vast majority—80%—of shipments are by sea, reaching major continents like Africa, South America, and the Middle East efficiently. (2) Landlocked neighboring countries are serviced through road or rail.(3) For urgent, lightweight spare parts, air transportation is available, providing swift and reliable delivery options.