Customization: | Available |
---|---|
Application: | Construction, Mining |
Certification: | ISO9001 |
Still deciding? Get samples of US$ 150/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Introduction:
The TPB-40 Pneumatic Crushing Pick stands as a testament to power and efficiency, driven by the formidable force of compressed air. It skillfully directs air to both ends of the cylinder block, thereby initiating a potent back-and-forth hammer movement. This dynamic mechanism delivers impactful blows to the drill's end, efficiently breaking through the concrete layer and reducing it to easily removable blocks.
Function:
KAITUO paving breakers are indispensable in road construction and building foundation sites, meticulously designed to fracture high-strength concrete with ease and precision.
High Durability & Long Life:
Crafted from premium alloy steel forged parts, this tool promises unmatched durability, guaranteeing long-lasting performance even in the most demanding environments.
The breaker features an innovative front head design, built for endurance, ensuring remarkable durability and extended longevity.
A removable bushing is incorporated to protect the front head from wear, significantly boosting the tool's operational lifespan.
Ergonomic Series Available:
Engineered with worker comfort as a priority, an anti-vibration handle is available, enhancing health care and minimizing fatigue.
Functions:
Equipped with a forged latch retainer, this tool permits quick and effortless chisel changes, greatly minimizing downtime and maximizing productivity.
With a 4-bolts handle design, it ensures low running costs, seamlessly blending efficiency with economical operations.
Parameter/name | TPB-40 |
Piston diameter | 44mm |
Piston stroke | 146mm |
Percussive frequency | 1050 B.P.M |
N.W | 18kg |
Length | 660MM |
Air consumption | 1.6 m³/min |
Tracheal diameter | 19 |
bit head size | R25*108 |
Price advantage
As a unified industrial and trade entity, we deliver unbeatable factory-direct pricing!
How long will it take to deliver?
As the manufacturer, we initiate production immediately upon order confirmation. For in-stock items, expect delivery within 15 days; larger orders may require up to 30 days for delivery.
What terms of payment do you accept?
Typically, we accept T/T or D/P. For T/T terms, a 30% deposit is required upfront, with the remaining 70% due before shipment.
How long are your prices valid?
As a factory with a solid reputation, our prices remain stable year-round, adjusting only under two conditions: (1) Fluctuations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs leading to manufacturer price adjustments.
What logistics can you use for transportation?
We employ three primary modes of freight transport: (1) 80% of our shipments are by sea to key continents such as Africa, South America, and the Middle East. (2) For landlocked neighboring countries, deliveries are made via road or rail.(3) For urgent and lightweight spare parts, air transportation is available.