Air Leg Rock Drill for High Efficiency Concrete Mining

Product Details
Certification: CE, ISO 9001:2000
Condition: New
Drilling Way: Rotary
Still deciding? Get samples of US$ 225/Piece
Request Sample
Gold Member Since 2024

Suppliers with verified business licenses

Year of Establishment
2024-04-24
Plant Area
1733 square meters
  • Air Leg Rock Drill for High Efficiency Concrete Mining
  • Air Leg Rock Drill for High Efficiency Concrete Mining
  • Air Leg Rock Drill for High Efficiency Concrete Mining
  • Air Leg Rock Drill for High Efficiency Concrete Mining
  • Air Leg Rock Drill for High Efficiency Concrete Mining
  • Air Leg Rock Drill for High Efficiency Concrete Mining
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Frequently asked questions
Overview

Basic Info.

Model NO.
YT28
Model No.
Yt28
Air Consumption
81L/S
Piston Diameter
80mm
Bit Head Size
R22*108mm
Model
Yt28
Drilled Holes Depth
1.2-5m
Transport Package
Carton/Wooden Box
Specification
70*28*20CM
Trademark
Kai tuo
Origin
Hebei
HS Code
8430390000
Production Capacity
1000pieces/Month

Product Description

Air Leg Rock Drill for High Efficiency Concrete Mining

Unveiling the YT28 Air-Leg Rock Drill, a pinnacle of high-performance, energy-efficient, and environmentally conscious rock drilling technology. The YT28 distinguishes itself within the realm of pneumatic tools with its exceptional reliability, lightning-fast rock penetration speed, and durable wear components built for longevity. In addition to these outstanding features, it offers a quiet operation, lightweight construction, and an intuitive user experience, making it the ideal choice for those seeking efficiency and ease.

Air Leg Rock Drill for High Efficiency Concrete Mining

Product Description

1. Introducing the YT28, a revolutionary tool boasting an optimal height and an impressive stroke range. Designed for precision, it excels in drilling anchor holes perfectly perpendicular to roof surfaces. This capability effectively resolves the common challenge of misaligned anchor holes in roadways, significantly enhancing project quality, accelerating progress, reducing construction costs, and elevating overall efficiency.
2. The YT28 delivers outstanding rock drilling performance, masterfully handling medium-hard rocks and those with a hardness coefficient of f≤6. Its incredible versatility makes it the ideal choice for both rock roadways and quasi roadways, offering superior adaptability in diverse environments.
3. Engineered with a streamlined structure, the YT28 is renowned for its exceptional durability and ease of maintenance. This translates to significantly lower maintenance costs, ensuring long-term operational reliability and efficiency.
4. Equipped with a state-of-the-art flexible start mechanism, the YT28 features an advanced air-water linkage, rapid air-leg return, and precise air pressure adjustment systems. These innovations guarantee unparalleled operational efficiency and user convenience.
5. The YT28's control handle is ingeniously integrated with the shank body, providing a unique and user-friendly operational experience. The innovative muffler cover not only diminishes noise but also allows for directional exhaust adjustment, optimizing conditions for field operations.
6. Perfectly suited for wet drilling, the YT28 Rock Drill excels in medium to hard rock conditions, making it an indispensable tool for such challenging environments.

Application Areas:

Mining, transportation, tunnels, water conservancy projects, quarries, and a multitude of other construction works benefit from this versatile and powerful tool.

Product Parameters

Air Leg Rock Drill for High Efficiency Concrete Mining
Product Model: YT28
Net weight: 26KG
Total length: 66.1CM
Air consumption: ≤81L/S
Impact frequency: ≥37Hz
Drilling diameter: 34-42mm
Piston diameter: 80mm
Piston stroke: 60mm
Working air pressure: 0.63mpa
Working water pressure: 0.3mpa
Drilling depth:  5M

Preparation and Setup for the YT28 Pneumatic Air Leg Rock Drill

1. Before embarking on any drilling task, ensure to meticulously inspect the integrity and seamless rotation of all parts. This includes the rock drill itself, bracket, or rock drill cart. Lubricate as necessary, ensuring smooth wind and water pathways, and secure all connections firmly for optimal performance.

2. Prioritize safety by meticulously examining the roof near your working face for any potentially dangerous live or loose rocks. Execute the required treatments to ensure a safe and secure working environment.

3. For precise and accurate drilling, make sure the working surface where you plan to locate the shell hole is thoroughly pounded flat beforehand. This prevents any slippage or displacement of the shell hole during operation.

4. Abide by strict guidelines against dry hole drilling. Commit to wet rock drilling by turning on the water supply first, followed by the wind when in use. Conversely, turn off the wind first before the water when stopping. Initiate drilling at a low speed, gradually increasing to full speed as you reach the desired depth.

5. For safety, drillers should refrain from wearing gloves during operation to mitigate potential hazards and ensure a secure grip on the equipment.

6. When employing the air leg for drilling, be conscious of your stance and position. Avoid using your body for additional pressure and steer clear of standing in front of the rock drill to prevent injuries from potential broken brazing.

7. If you notice any abnormal sounds or unexpected water discharges during the drilling process, immediately halt the machine for a comprehensive inspection. Diagnose and address the issue promptly before resuming work.

8. During withdrawal of the rock drill or when replacing the brazing rod, conduct the operation gently and with care. Pay close attention to the brazing rod's positioning to ensure a smooth and safe transition.

Detailed Photos

Air Leg Rock Drill for High Efficiency Concrete Mining
Air Leg Rock Drill for High Efficiency Concrete Mining

Air Leg Rock Drill for High Efficiency Concrete Mining

Frequently asked questions

Unbeatable Price Advantage
As a leading integrated industrial and trade enterprise, Xianghe Kaituo Mining Machinery Co., Ltd. proudly offers you unbeatable factory-direct pricing, maximizing value for every purchase!
Anticipated Delivery Timelines
As the proud manufacturer of the Air Leg Rock Drill for High Efficiency Concrete Mining, we kickstart production as soon as your order is confirmed. Enjoy swift deliveries: 15 days for stock items, and for larger orders, expect seamless delivery within 30 days.
Accepted Payment Methods
We offer flexible payment terms to suit your needs. Typically, we accept T/T or D/P. For T/T, a 30% deposit ensures the start of production, with the remaining 70% due before shipment, ensuring peace of mind for all parties.
Price Validity Period
At Xianghe Kaituo Mining Machinery Co., Ltd., we pride ourselves on maintaining stable pricing year-round. Price changes occur only when there's a significant fluctuation in the U.S. dollar exchange rate or an increase in labor and raw material costs, ensuring transparency and fairness.
Logistics and Transportation Options
Explore Three Dynamic Modes of Transportation (1) The vast majority, 80% of our shipments, traverse the seas, reaching major continents including Africa, South America, and the Middle East, showcasing our global presence.(3) For urgent requirements, especially lighter spare parts, our air transportation offers rapid delivery solutions, keeping your operations running smoothly.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier