Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency

Product Details
Certification: CE, ISO 9001:2000
Condition: New
Motor: Pneumatic
Still deciding? Get samples of US$ 225/Piece
Request Sample
Gold Member Since 2024

Suppliers with verified business licenses

Year of Establishment
2024-04-24
Plant Area
1733 square meters
  • Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency
  • Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency
  • Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency
  • Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency
  • Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency
  • Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Frequently asked questions
Overview

Basic Info.

Model NO.
YT27
Drill Hole Diameter
34-45mm
Drill Hole Depth
5m(Max)
Bit Type
Button Bit
Drilling Way
Rotary
Model No.
Yt27
Air Consumption
80 L/S
Piston Diameter
80mm
Bit Head Size
R22*108mm
Model
Yt27
Drilled Holes Depth
1.2-5m
Transport Package
Carton/Wooden Box
Specification
85*63*28CM
Trademark
Kai tuo
Origin
Hebei
Production Capacity
1000sets/Month

Product Description

Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency

Product Description


Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency

Features
1, The YT27 Air Leg Rock Drill is engineered with robust capabilities, featuring a powerful blow function that cleans the gun hole with proficiency and boasts a high torque for efficient brazing.
2, In addition to the inherent advantages of the YT27 Air-Legged Rock Drill, it incorporates a flange control valve designed to optimize gas production and includes a suite of additional innovative functions.
3, The YT27 Air-Legged Rock Drills excel in rock drilling applications, making them the prime choice for substantial mining operations and ambitious roadway construction projects.
4, Equipped with sophisticated mechanisms like air-water linkage, rapid air-leg return, and adjustable air pressure, the YT27 offers unparalleled performance.
5, The design features ergonomically centralized control handles, making the mechanism both innovative and user-friendly, ensuring seamless operation.
6, A sound-deadening cover is incorporated to significantly minimize noise levels and allows for versatile exhaust direction changes, greatly enhancing on-site working conditions.

Application areas:

From railways and tunnels to highways, metallurgy, coal mines, and extensive water conservancy and hydropower construction projects, the YT27 is your versatile partner in progress.

Product Parameters

Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency
Model Yt27
N.W 28kg
Length 688mm
Bit Head Size R22×108mm
Air Consumption ≤80 L/S
Percussive Frequency ≥36.7 Hz
Impact Energy ≥75.5 J
Boreholes Diameter 34-45mm
Piston Diameter 80mm
Piston Stroke 60mm
Working Air Pressure 0.63 Mpa
Working Water Pressure 0.3 Mpa
Drilled Holes Depth 2m-5m

Preparations for Using YT27 Rock Drills:Understanding Pneumatic Rock Drills

1. Prior to commencing any drilling operations, ensure that all components, inclusive of the rock drill, its bracket, or any accompanying rock drill cart, are thoroughly inspected for integrity and rotational function. Apply necessary lubricants generously and confirm that both wind and waterways are unobstructed. Also, verify that all connection joints are securely fastened.

2. Vigilantly inspect the roof in the vicinity of the working face for any live or loose rocks on both the roof and the second gang. Conduct necessary reinforcement or stabilization procedures to ensure safety.

3. Prior to initiating the rock drilling process, ensure that the surface where the flat shell hole is to be drilled is meticulously leveled and prepared. This preemptive measure aids in preventing any slippage or undesired displacement of the shell hole during drilling.

4. Adherence to wet drilling techniques is paramount; avoid dry eye drilling at all costs. Begin by activating the water flow before initiating the wind mechanism during operation, and reverse the sequence upon cessation. Initially, commence hole drilling at a reduced speed, subsequently escalating to full speed once a satisfactory depth has been achieved.

5. Drillers must refrain from wearing gloves during operation to ensure optimal tactile feedback and safety.

6. When utilizing the air leg for hole drilling, maintain a proper standing posture and position. Avoid exerting bodily pressure on the equipment, and under no circumstances should one stand directly in front of the rock drill or beneath an active brazing rod, as this poses a significant risk of injury from potential breakage.

7. Should any anomalous sounds or irregular water discharge occur during drilling, cease operations immediately. Conduct a thorough inspection to diagnose and rectify the issue before resuming the drilling process.

8. Exercise caution when withdrawing the rock drill or replacing the brazing rod. Allow the drill to run at a reduced speed and be vigilant of the rock drill braze positioning to ensure a safe transition.

Detailed Photos

Yt27 Air Consumption 80 L/S Pneumatic Drill for Mining EfficiencyYt27 Air Consumption 80 L/S Pneumatic Drill for Mining EfficiencyYt27 Air Consumption 80 L/S Pneumatic Drill for Mining Efficiency

Frequently asked questions

The Advantage of Our Pricing
As a seamless blend of industry and trade, we proudly provide you with factory-direct pricing, ensuring you receive the most competitive rates!
Delivery Timeline: How Long Will It Take?
As the manufacturer, once your order is confirmed, our production begins without delay. For stocked items, expect delivery within a swift 15 days. For larger orders, the delivery duration may extend up to 30 days.
Accepted Payment Terms
Our preferred payment methods are T/T or D/P. With T/T, a 30% deposit is required upfront, and the remaining 70% is due just before shipment.
Price Validity Period
As a trustworthy factory, our pricing remains stable throughout the year. Adjustments occur only in two scenarios: (1) Fluctuations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs leading to manufacturer price adjustments.
Logistics and Transportation Options
Three Primary Modes of Freight Transport (1) A significant 80% of our shipments traverse the seas to reach key continents such as Africa, South America, and the Middle East. (2) For our landlocked neighbors, we deliver via road or rail.(3) For urgent and lightweight spare parts, air transportation is available, ensuring a swift delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier