Customization: | Available |
---|---|
Application: | Construction, Mining |
Certification: | ISO9001 |
Still deciding? Get samples of US$ 150/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Introduction:
The TPB-40 Pneumatic Crushing Pick is a marvel of robust efficiency, harnessing the formidable power of compressed air. It distributes air skillfully to both ends of the cylinder block, initiating a powerful back-and-forth hammer movement. This dynamic mechanism delivers impactful strikes to the drill's end, penetrating the concrete layer and transforming it into easily removable fragments.
Function:
KAITUO paving breakers are indispensable in road construction and building foundation sites, meticulously designed to shatter high-strength concrete with ease and precision.
High Durability & Long Life:
Crafted from premium alloy steel forged parts, this tool offers unmatched durability, promising long-lasting performance even in the most challenging conditions.
With its pioneering front head design, this breaker is engineered for endurance, providing exceptional durability and longevity.
A removable bushing is incorporated to protect the front head from wear and tear, significantly extending the tool's operational life.
Ergonomic Series Available:
Designed with the worker's comfort at heart, the anti-vibration handle is available to enhance health and reduce fatigue, ensuring a more comfortable work experience.
Functions:
Equipped with a forged latch retainer, this tool facilitates quick and effortless chisel changes, considerably minimizing downtime.
The 4-bolts handle design ensures low running costs, seamlessly blending efficiency with economical operation.
Parameter/name | TPB-40 |
Piston diameter | 44mm |
Piston stroke | 146mm |
Percussive frequency | 1050 B.P.M |
N.W | 18kg |
Length | 660MM |
Air consumption | 1.6 m³/min |
Tracheal diameter | 19 |
bit head size | R25*108 |
Price Advantage
As a fully integrated industrial and trade enterprise, we provide factory-direct pricing, ensuring the best value!
How long will it take to deliver?
As the manufacturer, production commences immediately upon order confirmation. For in-stock items, delivery is expected within 15 days; larger orders may require up to 30 days for delivery.
What terms of payment do you accept?
We typically accept T/T or D/P. For T/T, a 30% deposit is required upfront, with the remaining 70% to be paid before shipment.
How long are your prices valid?
As a reputable factory, our prices remain stable throughout the year. Adjustments occur only under two conditions: (1) Fluctuations in the U.S. dollar exchange rate; (2) Significant increases in labor or raw material costs requiring manufacturer price changes.
What logistics can you use for transportation?
There are three primary modes of freight transport (1) 80% of our shipments are executed by sea to major continents like Africa, South America, and the Middle East. (2) Landlocked neighboring countries receive deliveries via road or rail.(3) For urgent, light spare parts, air transportation is available for speedy delivery.