Customization: | Available |
---|---|
Application: | Construction, Mining |
Certification: | ISO9001 |
Still deciding? Get samples of US$ 150/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Introduction:
The TPB-40 Pneumatic Crushing Pick embodies ultimate efficiency, utilizing the prodigious power of compressed air. By strategically directing air to both ends of the cylinder block, it initiates a potent hammer motion, delivering forceful impacts to the drill's end. This innovative mechanism effortlessly penetrates the concrete layer, fragmenting it into conveniently removable blocks with each powerful stroke.
Function:
KAITUO paving breakers are indispensable in road construction and building foundations, ingeniously designed to demolish high-strength concrete with spectacular ease.
High Durability & Long Life:
Crafted from top-grade alloy steel forged components, this tool showcases unmatched durability, guaranteeing exceptional performance even in the most demanding conditions.
Incorporating a groundbreaking front head design, this breaker is engineered for endurance, assuring remarkable longevity and durability.
A removable bushing is thoughtfully included to shield the front head from wear, significantly prolonging the tool's operational lifespan.
Ergonomic Series Available:
With a focus on worker comfort, an anti-vibration handle is available to promote health and minimize fatigue, enhancing user experience.
Functions:
Equipped with a forged latch retainer, this tool enables swift and effortless chisel changes, markedly reducing downtime for increased productivity.
The 4-bolts handle design ensures low operating costs, combining efficiency with cost-effective operation.
Parameter/name | TPB-40 |
Piston diameter | 44mm |
Piston stroke | 146mm |
Percussive frequency | 1050 B.P.M |
N.W | 18kg |
Length | 660MM |
Air consumption | 1.6 m³/min |
Tracheal diameter | 19 |
bit head size | R25*108 |
Price Advantage
As a vertically integrated industrial and trade enterprise, we offer factory-direct pricing for unmatched value!
How long will it take to deliver?
As the manufacturer, we initiate production promptly upon order confirmation. For stocked items, anticipate delivery within 15 days; larger orders may extend delivery to 30 days.
What terms of payment do you accept?
We generally accept T/T or D/P. For T/T transactions, a 30% deposit is required upfront, with the remaining 70% payable prior to shipment.
How long are your prices valid?
As a reliable factory, our prices remain stable throughout the year, with adjustments only in two scenarios: (1) Changes in the U.S. dollar exchange rate; (2) Escalations in labor or raw material costs necessitating price modifications.
What logistics can you use for transportation?
We utilize three primary freight transport modes (1) 80% of shipments are conducted by sea, reaching major continents including Africa, South America, and the Middle East. (2) Deliveries to landlocked neighboring countries are managed via road or rail.(3) For urgent light spare parts, air transportation is available to meet time-sensitive needs.