Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Unleash top-tier performance with unmatched efficiency, ensuring your projects are powered by excellence.
2. Swift Rock Drilling Speed: Delve into remarkable penetration rates, boosting productivity to new heights with rapid precision.
3. Superior Lubrication System: Engineered for longevity, this system ensures the seamless operation of moving parts, minimizing wear and maximizing durability.
4. Optimized Machine Design: Achieve the ultimate synergy of impact energy and frequency, making this the quintessential tool for rock drilling applications.
5. Advanced Gas and Water Linkage: Experience unparalleled operational efficiency with quick gas-leg returns and adaptable air pressure adjustments.
6. User-Centric Control: Enjoy a revolutionary control experience with centralized handle placement and noise-reducing muffler cover, providing adjustable discharge direction for improved on-site conditions.
Application Areas:
Perfectly suited for mining, traffic tunnel projects, water conservancy construction, quarries, and much more.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Preparation Steps Before Using the YT29A Rock Drill:
1. Begin by ensuring that all components, including the rock drill, bracket, and the rock drill cart, are in perfect condition and are thoroughly lubricated. Confirm that the wind and water pathways are unobstructed and that all connection joints are securely fastened.
2. Prior to commencing, examine the roof adjacent to the working face for any loose or unstable rocks. Address any potential hazards to ensure a safe working environment.
3. Confirm that the working surface is level and stable before starting the drilling process to prevent any unintended slippage or shifting.
4. It is crucial to drill with water to prevent dry drilling. Initiate the operation with water flow, followed by wind. When concluding, reverse the sequence by stopping the wind first. Begin drilling at a low speed, and once a certain depth is reached, transition to full speed for efficient operation.
5. Safety first: Operators must refrain from wearing gloves to ensure unrestricted control and to prevent accidents.
6. Maintain awareness of your stance and positioning while using the air leg. Avoid applying pressure with your body and refrain from standing directly in front of the rock drill to mitigate the risk of injury from broken brazing rods.
7. Should any abnormal sounds or unexpected water discharge occur, immediately cease operation. Conduct a thorough inspection and rectify any issues before resuming to ensure smooth and safe drilling.
8. When retracting the rock drill or replacing the brazing rod, proceed with caution. Operate the drill at a slower pace and be attentive to the position of the brazing rod to avoid accidents.
Unmatched Price Advantage
As a seamlessly integrated industrial and trade enterprise, we proudly present factory-direct pricing, ensuring unparalleled cost-effectiveness!
What is the Expected Delivery Timeline?
As the manufacturer, we expedite production immediately upon order confirmation. For in-stock items, anticipate a swift delivery within 15 days. For larger orders, the delivery timeline may extend to a maximum of 30 days.
Accepted Payment Terms
Our typical payment terms are T/T or D/P. For T/T transactions, a 30% deposit is required in advance, with the remaining 70% payable before shipment.
Price Validity Duration
As a reputable factory, we maintain price stability throughout the year, with adjustments occurring only under two specific conditions: (1) Significant fluctuations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs that necessitate manufacturer price recalibrations.
Available Logistics for Transportation
Three Main Modes of Freight Transport (1) A commanding 80% of our shipments are transported by sea to major destinations across Africa, South America, and the Middle East. (2) For landlocked neighboring countries, deliveries are efficiently managed via road or rail.(3) For urgent and lightweight spare parts, we offer the option of air transportation, ensuring speedy delivery.