Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Experience superior performance with advanced efficiency that sets new industry standards.
2. Swift Rock Drilling Speed: Achieve unparalleled penetration rates for peak productivity and efficiency in your mining operations.
3. Superior Lubrication System: Guarantees extended operational life of moving components, minimizing wear and tear for sustainable use.
4. Optimized Machine Design: Expertly engineered to deliver the perfect synergy of impact energy and frequency, making it an exemplary tool for rock drilling tasks.
5. Advanced Gas and Water Linkage: Equipped with rapid gas-leg return, air pressure modulation, and more, ensuring superior operational effectiveness.
6. User-Centric Control: Features a centralized control handle located with the back head for innovative and user-friendly operation. The inclusion of a muffler cover significantly reduces noise, while also providing adjustable discharge direction to enhance working conditions in the field.
Application Areas:
Perfectly suited for mining, traffic tunnels, water conservancy projects, quarries, and a variety of other applications.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Preparations Before Engaging the YT29A Rock Drill:
1. Confirm the integrity and proper lubrication of all components such as the rock drill, bracket, or rock drill cart. Verify the smoothness of air and water pathways, ensuring all connection joints are securely fastened.
2. Conduct a thorough inspection of the roof area near the working face to identify and eliminate any live or unsecured rocks before commencing operations.
3. Guarantee the working surface is level and stable prior to initiating drilling activities to prevent any risk of slippage or displacement during use.
4. Always employ water-assisted drilling techniques to avert dry drilling scenarios. Initiate the process with water flow, then introduce air; reverse this sequence upon stopping. Begin drilling at a low speed, transitioning to full speed only after achieving a suitable depth.
5. It is imperative that operators abstain from wearing gloves during the operation of the drill.
6. Maintain vigilance over your posture and positioning when utilizing the air leg. Refrain from applying body pressure and avoid positioning yourself directly in front of the drill to reduce the risk of injury from broken brazing rods.
7. Should any irregular noises or unusual water discharge occur, immediately cease operation to inspect and rectify the issue before resuming work.
8. When retracting the rock drill or substituting the brazing rod, proceed with caution, operating the drill slowly while remaining conscious of the brazing rod's positioning.
Unmatched Price Advantage
Experience factory-direct pricing with us as an integrated industrial and trade enterprise, ensuring you the most competitive and transparent prices available!
Delivery Timeline: How Long Will It Take?
As the manufacturer, we initiate production right after confirming your order. For items readily available, expect swift delivery within 15 days. Larger orders may take up to 30 days, ensuring every detail meets our high standards.
Payment Terms We Accept
We are flexible with T/T or D/P payments. With T/T, a 30% deposit secures your order, while the balance of 70% is due just before shipment.
Price Validity: Ensuring Consistency
Our pricing remains stable and consistent throughout the year, with adjustments only in response to significant changes such as shifts in the U.S. dollar exchange rate or escalations in labor and raw material costs.
Transport Logistics: Efficient and Reliable
We utilize three principal modes of freight transport to serve your needs effectively: (1) Maritime transport covers 80% of shipments, reaching major continents including Africa, South America, and the Middle East. (2) Deliveries to landlocked neighboring countries are made via road or rail, ensuring seamless connections.(3) For urgent and lightweight spare parts, we offer expedited air transportation.