Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Experience unparalleled performance with the Yt29A Efficient Air Drill Pneumatic Tool, delivering exceptional power for increased operational efficiency and productivity.
2. Swift Rock Drilling Speed: Achieve superior productivity with accelerated penetration rates, ensuring you maximize your output with every drill.
3. Superior Lubrication System: Benefit from a state-of-the-art lubrication system that significantly extends the lifespan of moving parts by minimizing wear and tear, ensuring consistent performance and reliability over time.
4. Optimized Machine Design: Discover the perfect equilibrium of impact energy and frequency, making this tool an indispensable asset for any rock drilling task.
5. Advanced Gas and Water Linkage: Enjoy enhanced operational efficiency with our innovative features such as quick gas-leg return and precise air pressure adjustments, designed for peak performance.
6. User-Centric Control: Operate with ease using our centralized control handle positioned at the back head, offering novel convenience. The integrated muffler cover not only reduces noise effectively but also allows for adjustable discharge direction, optimizing your field working conditions.
Application Areas:
Ideal for a wide range of applications including mining, traffic tunnels, water conservancy construction, quarries, and beyond, ensuring versatility and adaptability for all your drilling needs.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Before Using the YT29A Rock Drill:
1. It is essential to ensure every component, including the rock drill, bracket, or drill cart, remains pristine and impeccably lubricated. Verify that the wind and water pathways are unobstructed and ensure all connection joints are securely fastened for optimal performance.
2. Conduct a thorough inspection of the work site's roof to identify any unstable or loose rocks. Address and remedy these potential hazards to guarantee a safe commencement.
3. Ensure the drilling surface is perfectly leveled to prevent any risk of slippage or misalignment during operation, safeguarding efficiency and precision.
4. Prioritize safety by drilling exclusively with water to prevent the risks associated with dry drilling. Initiate the process with water, followed by wind, and when stopping, reverse this sequence. Begin drilling at a low speed, transitioning to full speed once sufficient depth ensures stability.
5. Operators must refrain from wearing gloves to maintain direct control and tactile feedback during the operation.
6. Emphasize correct posture and positioning when utilizing the air leg. Avoid using body weight to pressurize the drill and never position yourself directly in front of the rock drill to eliminate the risk of injury from fractured brazing rods.
7. Should any unusual noises or unexpected water discharge occur, immediately cease operation. Conduct a thorough inspection to identify and rectify the issue before resuming use.
8. Exercise caution when retracting the rock drill or replacing the brazing rod. Operate the drill at a slower pace and remain constantly aware of the brazing rod's position to prevent mishaps.
Discover Our Price Advantage
As a dynamic integrated industrial and trade enterprise, we proudly offer factory-direct pricing, ensuring unmatched cost-effectiveness and value!
Delivery Timeframes: How Long Will it Take?
As the esteemed manufacturer, we prioritize swift production upon order confirmation. For items readily available in our inventory, you can expect delivery within just 15 days. For more substantial orders, the delivery period may extend up to 30 days, ensuring precision and quality.
Understanding Our Payment Terms
Our standard payment terms include T/T or D/P. For T/T transactions, we require a 30% deposit upfront, with the remaining 70% payable before shipment, ensuring seamless processing.
Validity of Our Competitive Pricing
Our pricing, as a trustworthy factory, remains consistently stable year-round. Changes are rare and only occur due to two specific reasons: (1) Fluctuations in the U.S. dollar exchange rate; (2) Substantial increases in labor or raw material costs necessitating manufacturer price adjustments.
Logistics and Transportation Options Available
We offer three primary modes of efficient freight transport (1) A significant 80% of our shipments are dispatched by sea to major continents such as Africa, South America, and the Middle East, ensuring broad reach. (2) For landlocked neighboring countries, we provide reliable road or rail delivery options.(3) For urgent, lightweight spare parts, we offer expedited air transportation to meet your critical demands promptly.