Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Delivering unparalleled performance, our Yt29A Advanced Air Drill showcases increased efficiency, setting a new standard in power output for demanding tasks.
2. Swift Rock Drilling Speed: Elevate your productivity to new heights with this rapid penetration rate, designed to maximize efficiency and performance in every drilling operation.
3. Superior Lubrication System: Engineered for excellence, this system ensures prolonged operation of all moving parts, significantly reducing wear and tear while providing seamless functionality.
4. Optimized Machine Design: A masterful engineering feat, delivering the ultimate balance of impact energy and frequency, making it the quintessential tool for rock drilling.
5. Advanced Gas and Water Linkage: Featuring quick gas-leg return and precise air pressure adjustments, this system enhances operational efficiency and adaptability in challenging environments.
6. User-Centric Control: With innovative centralized control handle and back head design, coupled with a muffler cover that diminishes noise and offers adjustable discharge direction, it significantly enhances working conditions in the field.
Application Areas:
Perfectly suited for mining, traffic tunnels, water conservancy construction, quarries, and myriad other applications, making it an indispensable tool for professionals across industries.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Before Using the YT29A Rock Drill:
1. Prior to operation, ensure every component of the YT29A—including the rock drill, bracket, or rock drill cart—is in pristine condition and properly lubricated. Conduct thorough checks to confirm that wind and water pathways are unobstructed and that all connection joints are securely fastened.
2. Conduct a careful inspection of the roof near the working area to identify and remedy any loose or potentially hazardous rocks before commencing drilling activities.
3. Verify that the working surface is perfectly level prior to drilling. This precaution helps prevent any unwanted slippage or displacement during operation.
4. Always incorporate water into your drilling process to prevent the risks associated with dry drilling. Initiate the operation with water followed by wind, and reverse this order when ceasing operations. Begin at a modest speed, transitioning to full speed once a satisfactory depth is reached.
5. It is imperative for drillers to avoid wearing gloves during operation to ensure maximum tactile control and safety.
6. Adopt a mindful stance and position when utilizing the air leg. Refrain from applying pressure with your body and avoid positioning yourself directly in front of the rock drill to mitigate the risk of injury from potential brazing rod breakage.
7. Should you encounter any abnormal sounds or unexpected water discharges, immediately halt the machine, conduct a thorough inspection, and rectify any issues before resuming your work.
8. When retracting the rock drill or substituting the brazing rod, proceed with the operation at a gentle pace, ensuring careful consideration of the brazing rod's position to maintain safety and precision.
Unbeatable Price Advantage
As a prominent integrated industrial and trade enterprise, we proudly present our customers with factory-direct pricing, ensuring unparalleled value for your investment!
Delivery Timeframes: What to Expect?
As the manufacturer, we prioritize your order and initiate production immediately following confirmation. For products in stock, you can anticipate delivery within a swift 15 days. For larger orders, please allow up to 30 days for delivery.
Accepted Payment Terms
We generally accept T/T and D/P payment methods. For transactions via T/T, a 30% deposit is required to commence production, with the remaining 70% payable prior to shipment.
Stability of Our Pricing: How Long Are They Valid?
As a trusted and reputable factory, our pricing remains consistent throughout the year. Adjustments may occur only under two specific circumstances: (1) Significant changes in the U.S. dollar exchange rate; (2) Escalations in labor or raw material costs prompting necessary price modifications.
Logistics Options for Seamless Transportation
We offer three primary freight transport options to ensure efficient delivery: (1) A significant 80% of our shipments are transported by sea to major continents, including Africa, South America, and the Middle East. (2) For landlocked neighboring countries, we ensure reliable deliveries via road or rail.(3) For urgent shipments of light spare parts, we provide the option of fast air transportation.