Yt27 Pneumatic Rock Drill for Optimal Performance in Mining

Product Details
Customization: Available
Certification: CE, ISO 9001:2000
Condition: New
Still deciding? Get samples of US$ 225/Piece
Request Sample
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 30 days
Quality Assurance
The supplier provides quality assurance
100% Finished Products Inspection
The supplier inspects 100% of finished products.
to see all verified strength labels (19)
  • Yt27 Pneumatic Rock Drill for Optimal Performance in Mining
  • Yt27 Pneumatic Rock Drill for Optimal Performance in Mining
  • Yt27 Pneumatic Rock Drill for Optimal Performance in Mining
  • Yt27 Pneumatic Rock Drill for Optimal Performance in Mining
  • Yt27 Pneumatic Rock Drill for Optimal Performance in Mining
  • Yt27 Pneumatic Rock Drill for Optimal Performance in Mining
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Frequently asked questions
Overview

Basic Info.

Model NO.
YT27
Drill Hole Diameter
34-45mm
Drill Hole Depth
5m(Max)
Bit Type
Button Bit
Drilling Way
Rotary
Model No.
Yt27
Air Consumption
80 L/S
Piston Diameter
80mm
Bit Head Size
R22*108mm
Model
Yt27
Drilled Holes Depth
1.2-5m
Transport Package
Carton/Wooden Box
Specification
85*63*28CM
Trademark
Kai tuo
Origin
Hebei
Production Capacity
1000sets/Month

Product Description

Yt27 Pneumatic Rock Drill for Optimal Performance in Mining

Product Description


Yt27 Pneumatic Rock Drill for Optimal Performance in Mining

Features
1. The YT27 air leg rock drill is engineered with a powerful function for blowing and cleaning the drill hole, ensuring optimal performance at every stage. Its robust high torque is designed to efficiently turn and braze, setting new standards in power and precision.
2. Building upon the superior advantages of the YT27 air-legged rock drill, this model integrates a cutting-edge flange control valve which enhances gas production along with a suite of other advanced functionalities, elevating its performance capabilities.
3. The YT27 air-legged rock drills are impeccably suited for demanding rock drilling tasks in expansive mining operations and extensive roadway projects, delivering unparalleled efficiency and reliability.
4. Engineered with an innovative air-water linkage, this drill features rapid air-leg return and sophisticated air pressure adjustment mechanisms, ensuring seamless and precise operations.
5. Designed with user convenience in mind, all control handles are strategically positioned around the handle, making the mechanism both novel and exceptionally easy to operate.
6. Equipped with an effective sound-deadening cover, this tool significantly reduces noise levels and offers flexible exhaust direction adjustments, greatly enhancing the on-site working environment.

Application Areas:

Ideal for a diverse range of projects, including railway construction, tunnel excavation, highway development, metallurgy, coal mining, and water conservancy and hydropower construction projects, the YT27 shines as a versatile and invaluable tool across multiple industries.

Product Parameters

Yt27 Pneumatic Rock Drill for Optimal Performance in Mining
Model Yt27
N.W 28kg
Length 688mm
Bit Head Size R22×108mm
Air Consumption ≤80 L/S
Percussive Frequency ≥36.7 Hz
Impact Energy ≥75.5 J
Boreholes Diameter 34-45mm
Piston Diameter 80mm
Piston Stroke 60mm
Working Air Pressure 0.63 Mpa
Working Water Pressure 0.3 Mpa
Drilled Holes Depth 2m-5m

Preparations Before Engaging the YT27 Rock Drill: A Comprehensive GuideUnveiling the Power of Pneumatic Rock Drills: What You Need to Know

1. Begin by conducting a meticulous check of the integrity and rotation of all components, including the rock drill, bracket, or rock drill cart, before embarking on drilling. Ensure that you apply the necessary lubricants, verify the smooth flow of air and water paths, and confirm that all connection joints are securely fastened.

2. Conduct a thorough percussion on the roof proximate to the working face. This involves checking for any unstable or loose rocks on both the roof and second gang nearby, and taking the necessary remedial action to ensure safety.

3. Prepare the working surface for the flat shell hole by ensuring it is meticulously leveled in advance. This precaution prevents any slippage or unintended displacement of the shell hole during the drilling process.

4. Adherence to safe drilling practices is paramount. Avoid dry drilling by ensuring the use of wet rock drilling techniques. Start by turning on the water supply, followed by the wind. Conversely, when ceasing operations, turn off the wind first and then the water. Initiate the drilling at a slow speed, escalating to full speed only after achieving a substantial depth.

5. For optimal safety, it's crucial that drillers refrain from wearing gloves during the drilling operation.

6. When utilizing the air leg for hole drilling, maintain a mindful stance and position. Never rely on bodily force for pressure application, and avoid standing in front of the rock drill beneath the working brazing rod to preclude injury from potential breakage.

7. Should you encounter any unusual sounds or irregular water discharge during rock drilling, it is imperative to halt operations immediately. Conduct a thorough inspection to identify and resolve the issue before proceeding further.

8. During the withdrawal of the rock drill or replacement of the brazing rod, allow the drill to run at a reduced speed. Remain vigilant to the positioning of the rock drill braze for a secure and seamless transition.

Detailed Photos

Yt27 Pneumatic Rock Drill for Optimal Performance in MiningYt27 Pneumatic Rock Drill for Optimal Performance in MiningYt27 Pneumatic Rock Drill for Optimal Performance in Mining

Frequently asked questions

Unmatched Price Benefits
As an esteemed integrated industrial and trade enterprise, we proudly present our customers with factory-direct pricing, ensuring unparalleled cost efficiency and value!
Expected Delivery Timeline
As the esteemed manufacturer, we prioritize your orders by initiating production immediately upon order confirmation. For items readily available in stock, anticipate a swift delivery within a remarkable 15 days. For larger, more significant orders, delivery may extend gracefully up to 30 days.
Accepted Payment Terms
We typically accommodate T/T or D/P payment methods. For T/T transactions, a 30% deposit is required upfront to secure your order, with the remaining 70% balance due before the shipment is dispatched.
Duration of Price Validity
As a reputable and distinguished factory, we maintain stable pricing throughout the year. Adjustments may occur under two specific conditions: (1) Notable fluctuations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs that necessitate manufacturer price revisions.
Available Logistics Options for Transport
Explore the Three Main Modes of Freight Transport (1) A majority of 80% of our shipments are efficiently transported by sea to prominent continents like Africa, South America, and the Middle East. (2) Deliveries to landlocked neighboring countries are executed seamlessly via road or rail.(3) For urgent and lighter spare parts, we offer the convenience of air transportation, ensuring rapid and reliable delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier