Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Enhanced Output Power: Experience unmatched performance with our state-of-the-art, Yt29A Innovative Pneumatic Hammer Drill, delivering exceptional efficiency and robust power tailored for the most demanding concrete mining projects.
2. Swift Rock Drilling Speed: Achieve unparalleled productivity with lightning-fast penetration rates, making every drilling operation a breeze and maximizing your work output effectively.
3. Superior Lubrication System: Benefit from an advanced lubrication mechanism that guarantees extended machine life, ensuring all moving parts operate smoothly, thereby minimizing wear and tear over time.
4. Optimized Machine Design: Discover the seamless integration of impact energy and frequency in our machine's design, providing the ultimate tool for efficient and precise rock drilling, striking the perfect balance for all your projects.
5. Advanced Gas and Water Linkage: Leverage sophisticated features such as quick gas-leg return and convenient air pressure adjustments, enhancing operational efficiency and ensuring seamless performance.
6. User-Centric Control: Enjoy an ergonomic experience with our innovative centralized control handle, integrated with the back head for effortless operation. The muffler cover not only reduces noise significantly but also offers adjustable discharge direction, enhancing the working environment on-site.
Application Areas:
Ideal for use in challenging environments such as mining, traffic tunnels, water conservancy construction, quarries, and a wide range of other industrious applications.
Model | YT29A |
Weight | 26.5kgs |
Length | 659mm |
Air pressure | 0.4-0.63Mpa |
Impact frequency | <=39HZ |
Air consumption | <=86L/s |
Impact energy | >=78J |
Cylinder*stroke | 82mm*60mm |
Air pipe diameter | 25mm |
Shank dimension | 22*108mm |
Drilling depth | 5m |
Bit diameter | 34-45mm |
Before Using the YT29A Rock Drill:
1. Prior to starting your operation, ensure all components, such as the rock drill, supporting bracket, or rock drill cart, are in excellent condition and thoroughly lubricated. Confirm that wind and water pathways are unobstructed and that connection joints are firmly secured.
2. Conduct a meticulous inspection of the roof near your working area to identify and correct any live or loose rocks. Address these potential hazards to ensure safety before commencement.
3. Make certain that your work surface is leveled and stable to prevent any slippage or unwanted displacement during drilling operations.
4. It is imperative to commence drilling with water to prevent dry drilling. Initiate the operation with water first, followed by wind, and employ the reverse order when ceasing activity. Begin the drilling at a low speed and transition to full speed once you reach a significant depth.
5. For safety, drill operators should refrain from wearing gloves while operating the machinery.
6. Maintain a vigilant focus on your stance and positioning while utilizing the air leg. Avoid using your body for pressurization and ensure not to stand directly in front of the rock drill to prevent potential injuries from broken brazing rods.
7. Should any abnormal sounds or unexpected water discharge occur, immediately halt the machine, carry out a thorough inspection, and rectify the issue before resuming operations.
8. When withdrawing the rock drill or exchanging the brazing rod, proceed with the operation at a reduced speed and consistently monitor the position of the brazing rod to ensure a seamless and safe transition.
Unmatched Price Advantage
Harnessing the power of being an integrated industrial and trade enterprise, we are thrilled to offer you unparalleled factory-direct pricing that maximizes value and minimizes costs!
Delivery Timelines: How Soon Can You Expect Your Order?
As the manufacturer, we swiftly commence production upon receiving your order confirmation. For items readily available in stock, expect your delivery within a swift 15 days. For larger, bespoke orders, the delivery timeframe may extend, albeit efficiently, up to 30 days.
Accepted Payment Terms
We predominantly accept T/T or D/P payments. For T/T transactions, a 30% deposit is required upfront to secure your order, with the remaining 70% balance due prior to shipment, ensuring smooth and seamless transaction flow.
Price Validity Duration
As a distinguished factory, we proudly maintain stable pricing throughout the year. Price adjustments are rare and occur exclusively under two scenarios: (1) Significant fluctuations in the U.S. dollar exchange rate; (2) Increased labor or raw material costs necessitating adjustments by the manufacturer.
Transport Logistics: Your Shipping Options
We offer three primary modes of freight transportation, tailored to your needs: (1) An impressive 80% of our shipments traverse the seas, reaching major continents such as Africa, South America, and the Middle East. (2) For our landlocked neighboring countries, we ensure reliable deliveries via road or rail.(3) To accommodate urgent needs for light spare parts, our air transportation service is at your disposal, delivering swiftly and efficiently.