Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Still deciding? Get samples of US$ 225/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Outstanding Features
1. The YT27 air leg rock drill is engineered with the sophisticated feature of robust blowing and cleaning capabilities for the gun hole paired with an exceptionally high torque for turning to braze, ensuring superior performance.
2. Building on the distinguished advantages of the YT27 air-legged rock drill, it incorporates an innovative flange control valve, enhancing its functionality with the production of gas among other cutting-edge features.
3. The YT27 air-legged rock drills are ideally designed for optimal efficiency in rock drilling tasks within expansive mining operations and complex roadway projects, ensuring unparalleled results.
4. Equipped with sophisticated mechanisms like air-water linkage, quick return for the air-leg, and adjustable air pressure, the product promises a seamless and efficient operational experience.
5. Ingeniously designed, the control handles are strategically centralized around the main handle, offering a novel mechanism that is intuitive and user-friendly, enhancing operational ease.
6. The state-of-the-art sound-deadening cover is meticulously designed to significantly reduce noise levels and allows the user to alter the exhaust direction effortlessly, thereby improving on-site working conditions substantially.
Versatile Application Areas:
Our YT27 air drill excels across diverse applications such as railway constructions, tunnel excavations, highway developments, metallurgical operations, coal mining, as well as water conservancy and hydropower construction projects.
Model | Yt27 |
N.W | 28kg |
Length | 688mm |
Bit Head Size | R22×108mm |
Air Consumption | ≤80 L/S |
Percussive Frequency | ≥36.7 Hz |
Impact Energy | ≥75.5 J |
Boreholes Diameter | 34-45mm |
Piston Diameter | 80mm |
Piston Stroke | 60mm |
Working Air Pressure | 0.63 Mpa |
Working Water Pressure | 0.3 Mpa |
Drilled Holes Depth | 2m-5m |
YT27 Rock Drills: Pre-Operational Excellence GuideUnderstanding the Pneumatic Rock Drill: A Brief Overview
2. Hazards Elimination: Proactively examine the roof near the active work face by knocking – this crucial step identifies precarious live and loose rocks. Address any detected hazards with precision to maintain a safe working environment.
3. Stability First: For precision in rock drilling, prepare the shell hole location by thoroughly leveling it in advance. This pre-drilling action prevents any undesirable slippages or displacements, ensuring the accuracy and safety of your operation.
4. Commitment to Wet Drilling: Say no to dry drilling! Always engage in wet rock drilling by initiating water flow before activating the wind. Reverse the sequence for shutdowns: wind off first, then water. Begin with a gentle low-speed to establish a depth before ramping up to full-speed drilling for optimal performance.
5. Safety Attire Alert: Drill operators must refrain from wearing gloves during operations to maintain dexterity and safety.
6. Posture and Safety: When drilling with an air leg, maintain optimal posture and positioning. Avoid using your body weight to pressurize, and never stand in front of the rock drill's working brazing rod to prevent injury from any unexpected breaks.
7. Operational Vigilance: Should you detect any abnormal sounds or irregular water discharge while drilling, immediately halt operations. Investigate thoroughly to identify and rectify the cause before resuming to ensure continued safety and efficacy.
8. Precision in Withdrawal: Exercise caution when retracting the rock drill or changing the brazing rod. Allow the rock drill to run slowly and keep an attentive eye on the brazing position to maintain control and safety.